The situation

in 2016, the Hangzhou Xiaoshan International Airport launched three phases of expansion projects, with new buildings covering an area of more than 1.5 million square meters and a total investment of more than 27 billion yuan, more than the Hangzhou Xiaoshan International Airport Phase I and II expansion projects, major projects are planned to be completed and put into operation before the 2022 Asian Games. The Integrated Transportation Center is located in the enclosing area of the new and old terminal buildings, including subway, Airport Express, bus, taxi and other public transport modes. Construction began in January for the airport extension line on Line 1(Lower Sha Xiaoshan Waterfront -- Hong Kong Airport) and the Xiaoshan Airport station on Line 7(Wu Shan Plaza -- Hong Kong Airport) . Along the way, the airport rail express links Hangzhou's three major transport hubs, Hangzhou West, Hangzhou East and Xiaoshan Airport. It takes only 45 minutes to get to the Hangzhou Xiaoshan International Airport from Hangzhou West railway station. When the third phase of the expansion project comes into operation, Hangzhou Xiaoshan International Airport will become the second largest aviation hub in eastern China after Pudong Airport, at the same time, it will build an integrated transportation center for the airport with multiple modes of transportation, including subway, high-speed rail, buses, private cars, internet hailing, taxis, and so on, to comprehensively enhance the airport's support capacity, create a new international city portal.


The solution

For the first time, the FPS integrated pumping station was selected for this Hangzhou Xiaoshan International Airport Project. The project is a combined system of rain and sewage. The amount of rain in the flood season will be especially large. As it is an airport area and the land area is also very small, we have helped our clients design the maximum flow rate of a single-barrel pumping station, which is 18,000 tons per day, this to the pump station interior space arrangement and the pump performance put forward the very high request, in the plan we have chosen the 3800mm * 8300 pump station, the pump is 22KW (3 uses a spare) , equipped with the FACIOLATI CFD anti-siltation base and intelligent electronic control system. At the same time, combined with the intelligent cloud remote monitoring and maintenance platform, enhanced the airport sewage transportation capacity, truly unattended, greatly reducing the cost of operation and maintenance. Transportation and construction is difficult, because the local government attaches great importance to, in order to ensure the smooth completion of the project, approved by the provincial government, the project used the Pile Foundation first program. The first part of the Pile Foundation to organize the construction, supervision units to familiarize with the drawings in advance, Fajorati after-sales training and guidance in advance, to prepare in advance for the temporary installation and construction of hydropower access, for the installation and commissioning of all ready. The FPS integrated pumping station, including design, manufacture, installation and commissioning, was completed in just 20 days, creating an even shorter construction period, the achievement of lower cost, less occupation area and larger single-cylinder pumping capacity has fully brought into play Faciolati's professional competence and professionalism, and has been fully recognized and praised by customers.